Work Experience

7/22/2013 to Present
Nuclear Mechanical Planner 
(Modification/Maintenance/Welding)
Duke Energy
H.B. Robinson Unit 2
Hartsville, SC 29550

Responsibilities: 

Notable Achievement:
Developed a new method for Designing Weld Maps utilizing Microsoft Excel and SnagIt. Designed a Weld Map Catalog which contains different components ie; piping, valves, fittings etc. (small bore and large bore) most commonly used when designing welds. This process has streamlined Weld Planning to maximize efficiency and provides the Welders with an accurate display of what the completed fabrication should look like to eliminate the confusion associated with welders trying to "interpret" what the Weld Map is calling for them to build. Additionally, developed a process to document the research that is associated with validating plant materials for safety related welds based on OE of poor research for material validation when designing welds. Examples of these documents are available (Click Work Examples).

03/04/2013 to 7/22/2013
Nuclear Mechanical Planner 
(Modification/Maintenance/Welding)
Sun Technical  
Contracted to Duke Energy
H.B. Robinson Unit 2
Hartsville, SC 29550

Assist in Modification and Maintenance Planning to support RO28 outage.

Responsibilities: 
Duties were the same as those listed above


02/04/2008 to 03/04/2013

Nuclear Mechanical Planner
(Modification/Maintenance)
Sun Technical  
Contracted to Progress Energy
Crystal River Unit 3
Crystal River, FL 34429

Also Shared Resource to
H.B. Robinson Nuclear Plant
Darlington, SC

Current Work Scope:

Supporting CR3 EPU Phase 3 preparations for R17.  This phase of planning requires performing numerous Field Walkdowns to breakdown the removal/installation processes and to take accurate field dimensions of affected system piping and associated hangers. Additionally, I have been working closely with all engineering departments to solidify the EC package details and I have been developing and planning detailed Work Instructions for Modification Engineering Changes.  Supporting station maintenance planning activities as necessary.


Shared Resource (H.B. Robinson) 
4KV Recovery Project Planner 
Work Scope:

For the period of 5-1-2010 through 7-9-2010, I accepted an assignment to travel from CR3 to Progress Energy’s H.B. Robinson Nuclear Plant in Darlington, South Carolina to support their outage under the supervision of RNP Planning Supervisor Steve Moore. SGT (the Steam Generating Team) was the contractor performing the repairs and developing the work instructions.   In this position, I acted as the Progress Energy Planner to carry out all administrative functions within PassPort which included the following:


I was assigned to this project because of my familiarity with the Work Management/Project Controls process established between SGT and Progress Energy for the CR3 Containment Repair Project.  The process needed to be incorporated at H.B. Robinson to provide a consistent work flow during the 4KV Recovery Project.  When I arrived at Robinson, no one was aware of the process or how it was going to work.  To aid in the widespread communication of the process and associated roles and responsibilities, I created documents to explain the processes, roles and responsibilities, and expectations.  These documents are available below:

PGN - SGT Work Process
SGT WPCN Process



EPU Phase 2 Work Scope:

Assisted in the total planning effort for Phase 2 of the three phase Extended Power Uprate (EPU) project.  The ultimate goal of EPU is to upgrade the plant to generate 1080MW/e.  The scope of Phase 2 EPU included the replacement of large components, and upgrades to the existing plant equipment listed below to meet EPU final design requirements: 


Responsibilities: 


Notable Achievements:

R16 Outage Planning Guidance
Created an interactive desktop procedure utilizing screenshots and hyperlinks to be shared with our EPU Project Planning department during the outage to better coordinate and enforce alignment between night-shift and day-shift work processes.  This document ensured that our entire department modified Work Orders in a consistent manner.  I included hyperlinks to the appropriate planning documents and tools to improve work performance. This saved a lot of outage time collectively, and improved the quality of our Work Orders.  A copy of this document is available for viewing by clicking the R16 OUTAGE PLANNING GUIDANCE link below:  

Designed New Relocation Configuration
Created a conceptual design to send to Sulzer Pumps Project Management to expedite their engineering design, and to ensure that the appropriate equipment data was being used for calculations.  After performing research on placement, gathering measurements and finding the vendor data for each component, I had a 3D model drafted by our Designer. The documentation including the 3D models are located below:

_________________________________________________________________

10/02/2007 to 12/05/2007

Ironworker Helper
DZ Atlantic
Contracted to Dominion Virginia Power at Surry Nuclear Power Station 
Surry, VA
Jimmy Jackson (Supervisor)
(757) 365-2789
Assist in the installation of NRC GSI-191 Containment Sump Modification for Surry Power Station Unit 1 during a refueling outage.  All work is performed in radiation areas; frequently in confined spaces. I perform my work according to all code and regulation requirements, and I am aware and have knowledge of occupational safety practices. I use required personal safety equipment such as safety goggles, gloves, and respirators.  Prerequisites for working this job include obtaining a Security Clearance and scoring at least 85% on all Radiation Worker Training tests.
_________________________________________________________________

08/28/2007 to 09/30/2007

Ironworker Helper
DZ Atlantic
Contracted to Dominion Virginia Power at North Anna Nuclear Power Station 
Mineral, VA
Jimmy Jackson (Supervisor)
(757) 365-2789
Assisted in the installation of NRC GSI-191 Containment Sump Modification for North Anna Nuclear Power Station Unit 1 during a refueling outage.  All work is performed in radiation areas; frequently in confined spaces. I perform my work according to all code and regulation requirements, and I am aware and have knowledge of occupational safety practices. I use required personal safety equipment such as safety goggles, gloves, and respirators.  Prerequisites for working this job included obtaining a Security Clearance and scoring at least 85% on all Radiation Worker Training tests.
__________________________________________________________________

07/09/2007 to 08/28/2007

Ironworker Helper
DZ Atlantic
Contracted to Dominion Virginia Power at Surry Nuclear Power Station 
Surry, VA
Jimmy Jackson (Supervisor)
(757) 365-2789
Perform pre-outage work related to the installation of NRC GSI-191 Containment Sump Modification for Surry Power Station Unit 1 which will take place during the November 2007 refueling outage.  
__________________________________________________________________

03/5/2007 to 04/26/2007
Ironworker Helper
The Atlantic Group
Contracted to Dominion Virginia Power at North Anna Nuclear Power Station 
Mineral, VA
Jimmy Jackson (Supervisor)
(757) 365-2789

Assist in the installation of NRC GSI-191 Containment Sump Modification for North Anna Nuclear Power Station Unit 2 during a refueling outage. All work was performed in radiation areas; frequently in confined spaces. Prerequisites for working this job included obtaining a Security Clearance and scoring at least 85% on all Radiation Worker Training tests.
__________________________________________________________________

08/9/2006 to 11/21/2006

Ironworker Helper
The Atlantic Group
Contracted to Dominion Virginia Power at Surry Nuclear Power Station 
Surry, VA  23883
Jimmy Jackson (Supervisor)
(757) 365-2789

Assisted in the installation of NRC GSI-191 Containment Sump Modification for Surry Nuclear Power Station Unit 2 during a refueling outage. All work was performed in radiation areas; frequently in confined spaces. Prerequisites for working this job included obtaining a Security Clearance and scoring at least 85% on all Radiation Worker Training tests.
__________________________________________________________________

05/30/2005 to 07/28/2006
Painter/Welder/Laborer
Press Construction
Talladega, AL 35160
James Pressley (Owner) 
(256) 362-0854

Perform all duties common to the construction trade. Must possess ability to read blueprints, technical drawings, and schematic diagrams used in construction. Requires use of all common hand tools and all tools common to the trade such as electric drills and saws and hydraulic nailers and presses.  Perform painting preparation and painting. I am a trained welder and perform welding duties to repair construction equipment as needed.
__________________________________________________________________

06/01/2004 to 08/31/2004
Summer Job
Painter/Welder/Laborer
Press Construction 
Talladega, AL 35160
James Pressley (Owner) 
(256) 362-0854

Duties were the same as those listed above.




TO TOP OF PAGE


R16  OUTAGE PLANNING GUIDANCE
Canon H. McCray
Styrofoam Mock-up Atmospheric Dump Valve created to identify travel path and installation interferences
Nuclear Qualifications

Link to Progress Energy Personnel Qualification Data for December 2010 applicable to Crystal River Nuclear Plant